• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

Houston Sports Today

Houston Sports News Continuously Updated

  • Football
    • Roughnecks
    • Texans
  • Astros
  • Rockets
  • Soccer
    • Dash
    • Dynamo
  • Colleges
    • Rice
    • Texas A&M
    • University of Houston

Astros Ace Behind Schedule Due to Shoulder Inflammation

February 15, 2024 by Last Word On Baseball

It’s the start of spring training, and the Houston Astros already have bad news. Veteran right-hander Justin Verlander said a shoulder issue has put him behind his throwing schedule by a few weeks. It could very well jeopardize his status for Opening Day. Verlander told reports Wednesday that he experienced a “little hiccup” in his pitching shoulder.

“I’m a little bit behind schedule right now,” Verlander said. “I had a little hiccup early on that’s resolved itself. But I have to be really cautious on how I’m building up. I guess my body doesn’t respond the same at 40 as it did at 25.”

Astros pitcher Justin Verlander on his “hiccup,” which he says has resolved itself. He’s a couple of weeks behind schedule. pic.twitter.com/tqMajczi6F

— Brian McTaggart (@brianmctaggart) February 14, 2024

Astros Verlander Being Cautious with Injury

The three-time Cy Young Award winner will be 41 next week. He also acknowledged that he is on a tight timeline and said he will prioritize rest.

“I’ve always liked to give myself as much rest as possible, so my timeline is always a little tight,” he said. “I think that rest is important, so with the tight timeline and having to slow things down a little bit, put me a little behind.”

Verlander, who was traded back to the Astros from the New York Mets, also experienced a delayed start last year. He didn’t debut until May 4, making 16 starts for New York before returning to Houston. The injury concern is minor right now. However, it’s not the ideal situation Houston wants to be in,, as a couple of their rotation members are dealing with issues. The Astros will already be without Luis García and Lance McCullers Jr. to start the season, with both pitchers undergoing surgeries last year.

Without those two, Houston’s rotation is projected to be Verlander, Framber Valdez, Cristian Javier, and Hunter Brown.

J.P. France Dealing with Same Injury Issue

Verlander isn’t alone in the injury department, as J.P. France is dealing with shoulder inflammation, too. France felt something in his shoulder in his final bullpen session before camp two weeks ago. There isn’t too much worry since both pitchers are playing catch.

“We’re taking it day by day,” France said. “I’m not trying to push it too much, not trying to make a week’s worth of injury into months. We’re just taking it slow.”

France, who will be 29 in April, tossed 136 1/3 innings last year with a 3.83 ERA, 17.4% strikeout rate, 8.1% walk rate, and a 42.8% ground ball rate. While he is not guaranteed a roster spot since he has options, he would have been a candidate to step up if Verlander needed to miss. Yet that could be in jeopardy if France misses time.

Photo Credit: © Sam Navarro-USA TODAY Sports

 

The post Astros Ace Behind Schedule Due to Shoulder Inflammation appeared first on Last Word On Baseball.

Filed Under: Astros

Primary Sidebar

Recent Posts

  • SF Giants’ Verlander was in no mood to celebrate major milestone Sunday
  • Houston Astros return right-hander to rotation after 14-month hiatus
  • Pawol breaks gender barrier, earns good reviews for her work behind the plate on historic weekend
  • Houston Dash Win Thriller on Sophie Schmidt Stoppage Time Strike
  • Breaking: Texans Urged To Trade Top Veteran – 4 Possible Destinations

Categories

  • Astros
  • Colleges
    • Rice
    • Texas A&M
    • University of Houston
  • Football
    • Texans
  • Rockets
  • Soccer
    • Dash
    • Dynamo
  • Uncategorized

Archives

  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023

Our Partners

All Sports

  • 247 Sports
  • Bleacher Report
  • CBS Houston
  • Houston Chronicle
  • House Of Houston
  • OurSports Central
  • The Sports Daily
  • The Sports Fan Journal
  • The Spun
  • USA Today

Baseball

  • MLB.com
  • Last Word On Baseball
  • MLB Trade Rumors
  • Climbing Tals Hill
  • The Crawfish Boxes

Basketball

  • NBA.com
  • Amico Hoops
  • Hoops Hype
  • Hoops Rumors
  • Last Word On Pro Basketball
  • The Dream Shake
  • Real GM
  • Pro Basketball Talk
  • Space City Scoop

Football

  • Houston Texans
  • Battle Red Blog
  • Last Word On Pro Football
  • NFL Trade Rumors
  • Our Turf Football
  • Pro Football Rumors
  • Pro Football Talk
  • Texans Wire
  • Toro Times

Soccer

  • Dynamo Theory
  • Last Word on Soccer - Dash
  • Last Word on Soccer - Dynamo
  • MLS Multiplex

College

  • Busting Brackets
  • College Football News
  • College Sports Madness
  • Forgotten 5
  • Good Bull Hunting
  • Gig Em Gazzette
  • Last Word On College Football - Texas A&M
  • Saturday Blitz
  • Zags Blog

Recent Posts

  • SF Giants’ Verlander was in no mood to celebrate major milestone Sunday
  • Houston Astros return right-hander to rotation after 14-month hiatus
  • Pawol breaks gender barrier, earns good reviews for her work behind the plate on historic weekend
  • Houston Dash Win Thriller on Sophie Schmidt Stoppage Time Strike
  • Breaking: Texans Urged To Trade Top Veteran – 4 Possible Destinations

Recent Comments

    Archives

    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023

    Categories

    • Astros
    • Dash
    • Dynamo
    • Rice
    • Rockets
    • Texans
    • Texas A&M
    • Uncategorized
    • University of Houston

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Copyright © 2025 · Magazine Pro on Genesis Framework · WordPress · Log in